Notes & Steps:
Ensure die holes are filled with oily material.
Loosen cutter holder clamping bolts; move cutter up.
Open main machine door, remove feed hopper bolts with Allen wrench, take off hopper.
Remove gap adjustment block; adjust pressure rollers to move outer sides away from die inner wall.
Remove hoop screen between ring die and connecting sleeve.
Safety first: Use overhead crane to lift the heavy/large ring die (prevent falling). Pry with crowbar if tightly connected.
Thank you for reading! We're a pellet mill & complete production line manufacturer, focusing on quality and customization.
Welcome to consult – we'll help boost your production efficiency.
If you want to know more about our pellet mill, welcome to subscribe to our YouTube channel.